Updating disconnected systems without the public internet

A disconnected system still needs updates. The question is how to deliver them with verified origin, customer approval and a tested way back.

Disconnecting a system removes one kind of risk, but it does not remove the need for updates. Software, dependencies and models change. The proposed GridFlex approach treats each update as a controlled, recorded change with a tested way back.

Proposed concept Updates: approval, verification and recovery
  1. Acquire Get the release bundle through an approved channel.
  2. Authenticate Check the signature and manifest. A checksum alone does not prove where a file came from.
  3. Approve The customer approves, with two approvers where required.
  4. Transfer Through an approved repository, maintenance gateway or controlled removable media.
  5. Verify on arrival Check the signature and integrity again at the destination.
  6. Stage Prepare the release without switching it on.
  7. Activate Only with customer approval.
  8. Validate Confirm the system works as expected.
  9. Record Log versions, approvals and results.

Recovery: if validation fails or an installation is interrupted, return to a tested known-good version through an approved recovery path. Model updates must never silently change safety limits or shutdown authority.

What a release bundle would contain

A release bundle would include the software and its dependencies, model and preprocessing versions, a signed manifest with hashes, compatibility and prerequisite information, a software bill of materials, release notes, evaluation results and recovery instructions.

Origin matters

A checksum shows that a file has not changed in transit. On its own, it does not prove where the file came from. Signature verification against keys the customer trusts is what links a bundle to its publisher, and it is checked again at the destination.

Delivery paths

Updates could arrive through a customer repository, an approved maintenance gateway, controlled removable media or other sponsor-authorized distribution. Tactical or operational links are not a default update channel.

Approval and activation

Approval stays with the customer, with two approvers where required. Staging prepares a release without switching it on; activation happens only with approval; validation confirms the system works as expected before the change is recorded.

Plan the way back

Recovery is tested before it is needed: a known-good version, handling of interrupted installations and database or configuration compatibility. Model updates must never silently change safety limits or shutdown authority.